Materials Research Laboratory Bldg. 615 - Interruption of Ventilation, Heating, Cooling and Exhaust

Scheduled for Sep 15, 05:00 PDT  -  Sep 21, 14:00 PDT

Scheduled

Materials Research Laboratory Bldg. 615 - Interruption of Ventilation, Heating, Cooling and Exhaust


Date: September 15 to September 21, 2026
Time: 5am to 2pm intermittently

Facilities Management Preventative Maintenance staff will be performing scheduled maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work will include inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and heating and cooling systems. Please note the following schedule.
---------------------------------------------------------------------------------------------
Tuesday September 15, 2026
HVAC Supply Fan S-1 will be off before normally scheduled hours
(This fan supplies air for all labs.)

Fume hood exhaust fans FE-1, FE-2, FE-3, and FE-4 will be off from 8AM to 12 noon.
(These fans provide fume hood and general exhaust in all labs.)

---------------------------------------------------------------------------------------------
Wednesday September 16, 2026

Emergency Generator will be tested, 7:30am to 8:30am
(Only Emergency Circuits will be affected by transfer of power)


---------------------------------------------------------------------------------------------
Thursday September 17, 2026

Building Heating system will be off from 8AM to 4PM.

---------------------------------------------------------------------------------------------
Friday September 18, 2026

Building cooling system will be off from 8AM to 2PM.
Compressed Air may be disrupted from 8AM to 9am
---------------------------------------------------------------------------------------------

Monday September 21, 2026

Lab equipment cooling water will be off from 8AM to 2PM.
---------------------------------------------------------------------------------------------

Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.
Posted Aug 19, 2026 - 20:46 PDT
This scheduled maintenance affects: CAMPUS BUILDINGS (Materials Research Lab - UCSB Building 615).