Harold Frank Hall Bldg. 556 - Interruption of Ventilation, Heating, Cooling and Exhaust
September 8 to September 14, 2026
Facilities Management Preventative Maintenance staff will be performing scheduled maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work will include inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and heating and cooling systems. Please note the following schedule.
Tuesday September 8, 2026
Supply fan S-1 will be off 5am-Noon (Serves south side--first floor, second floor, and part of the third floor.) --------------------------------------------------------------------------------------------- Wednesday September 9, 2026
EMERGENCY GENERATOR WILL BE TESTED FROM 7:30AM to 8:30AM.
Supply fan S-2 will be off. 5am-Noon (Serves north side--first floor, second floor, and part of the third floor.) --------------------------------------------------------------------------------------------- Thursday September 10, 2026
Supply fan S-3 will be off from 5AM to 12 Noon. (Serves south side--fourth floor, fifth floor, and part of the third floor.)
--------------------------------------------------------------------------------------------- Friday September 11, 2026
Supply fan S-4 will be off 5am to Noon (Serves northside--fourth floor, fifth floor, and part of the third floor.)