Broida Hall Bldg. 572 - Interruption of Ventilation, Heating, Cooling and Exhaust
Scheduled Maintenance Report for UCSB Administrative Services
Completed
The scheduled maintenance has been completed.
Posted Nov 16, 2024 - 14:00 PST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Nov 16, 2024 - 06:00 PST
Scheduled
Broida Hall Bldg. 572 - Interruption of Ventilation, Heating, Cooling and Exhaust

Date: November 15, 2024
Time: 6AM to 2 pm

FM Preventative Maintenance staff will be performing scheduled maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.


Exhaust Fan EF-1 will be off from 6:00AM - 12:00noon (serves 6-story labs)

Heating Hot Water Pump-1 will be off from 10am to 2pm
Posted Nov 15, 2024 - 12:17 PST
This scheduled maintenance affected: CAMPUS BUILDINGS (Broida Hall - UCSB Building 572).