Ocean Science Education Bldg. 514 - Interruption of Ventilation, Heating, Cooling and Exhaust

Scheduled for Oct 23, 05:00 PDT  -  Oct 26, 14:00 PDT

Scheduled

Ocean Science Education Bldg. 514 - Interruption of Ventilation, Heating, Cooling and Exhaust

Date: October 23 to October 26, 2026
Time: 7am to 4pm intermittently

FM Preventative Maintenance staff will be performing scheduled maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.
--------------------------------------------------------------------------------------------
Friday October 23, 2026

All cooling and supply air systems will be off from 5:00AM to 2:00PM:
Fan Coil FC-1
Fan coil FC-2
Fan F-2,
Heat Pump HP-1
Chilled Water Pumps CHWP-3 and CHWP-4
--------------------------------------------------------------------------------------------
Monday October 26, 2026

All heating and exhaust air systems will be off from 5:00AM to 2:00PM:
Exhaust Fan EF-1
Exhaust Fan EF-2
Exhaust Fan EF-3
Hot Water Pumps HWP-5 and HWP-6

Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.
Posted Sep 17, 2026 - 17:59 PDT
This scheduled maintenance affects: CAMPUS BUILDINGS (Ocean Science Education Building - UCSB Building 514).