Engineering Science Bldg. 225 - Interruption of Ventilation, Heating, Cooling and Exhaust
Date: June 28 to July 5, 2024 Time: 7AM to 4PM intermittently
FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.
PLEASE MAKE SURE ALL OCCUPANTS ARE NOTIFIED NOT TO USE FUME HOODS AND GAS CABINETS DURING OUTAGES AFFECTING THEIR AREAS.
Friday July 25, 2025 HVAC Supply Fan 1 – System will be Off Serves Labs on second and third floor north _____________________________________________________________________________________ Monday July 28, 2025 HVAC Supply Fan 2– System will be Off (Serves labs on second and third floor south) _____________________________________________________________________________________ Tuesday July 29, 2025
Exhaust Fans EF-1 and EF-2 – will be off from 8am- 12 noon. (Serves all labs and fume hoods on second and third floor) _____________________________________________________________________________________ Wednesday July 30, 2025 Emergency Generator will be tested Wednesday 7:30am – 8:30am (generator tests will affect emergency circuits throughout the building. Emergency circuits will lose power briefly during the test - less than one minute while switching to the generator)
Compressed Air for general lab air will be off line 8:00AM to 9:00AM for replacement of tank safety valves
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.
Posted Jun 22, 2025 - 19:29 PDT
This scheduled maintenance affects: CAMPUS BUILDINGS (Engineering Science - UCSB Building 225).