Identified - Student Affairs & Administrative Services (Bldg 568) Elevator 2 is temporarily out of service while maintenance work is performed.
Our teams have been actively working on the elevator repair and are currently awaiting delivery of a required replacement part. Once the part is received, we will proceed with the repair and restore the elevator to service as quickly as possible.
If you have any questions or concerns, please contact Ray Gonzales, FM Superintendent for Life Safety Services, at 805-451-8993.
Jan 21, 2026 - 16:01 PST
Update - We are continuing to investigate this issue.
Jan 05, 2026 - 08:37 PST
Investigating - The steam boilers located in the basement that primarily serve the fourth floor auto claves in Bio II (571) have turned off for a unscheduled repair. We are actively working on securing the needed parts for the repair and strive to limit downtime to as little as possible.
If you have any questions or concerns, please contact Mark Irwin Superintendent Plumbing Services, at 805-722-8397
Thank you for your patience during this maintenance period.
Aug 22, 2025 - 15:24 PDT
Identified - The Biological Sciences II (Bldg 571) Elevator #1 is temporarily out of service while maintenance work is performed.
If you have any questions or concerns, please contact Ray Gonzales, Facilities Management Superintendent for Life Safety Services, at 805-451-8993
Sep 10, 2025 - 08:05 PDT
Welcome to the UCSB Administrative Services Status page. This site provides timely information on resources managed by the Administrative Services Division of UCSB, including maintenance events, construction disturbances, and other service interruptions of business/IT systems and facilities. Please subscribe to email or text notifications advising when a major incident takes place or when infrastructure interruptions occur at specific UCSB facilities.
Scheduled -
Recreation Center Expansion Bldg. 511 - Interruption of Ventilation, Heating, Cooling and Exhaust
Date: January 20 to January 22, 2026 Time: 7AM to 4PM intermittently
FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems. -------------------------------------------------------------------------------------------- All HVAC will be serviced - Monday January 20 to Wednesday January 22 before normally occupied hours. -------------------------------------------------------------------------------------------- Wednesday January 21, 2026 Emergency Generator will be tested from 7:30 AM to 8:30 AM All electrical equipment connected to emergency power will be affected. -------------------------------------------------------------------------------------------- Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.
Dec 23, 2025 - 18:20 PST
Recreation Center Bldg. 516 - Interruption of Ventilation, Heating, Cooling and Exhaust
Date: January 23, 2026 to January 27, 2026 Time: 7AM to 4PM intermittently
FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems. -------------------------------------------------------------------------------------------- All HVAC will be serviced - January 23 to January 27, before normally occupied hours. -------------------------------------------------------------------------------------------- Tuesday January 27, 2026 Emergency Generator will be tested from 7:30AM to 8:30AM All electrical equipment connected to emergency power will be affected. -------------------------------------------------------------------------------------------- Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu. Posted on
Dec 23, 2025 - 18:27 PST
FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and pumps and inspection/repair of associated systems.
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu. Posted on
Dec 23, 2025 - 18:31 PST
Location: 245 Arnhold Tennis Center Date: January 30, 2026 Time: 7am to 4pm intermittently
FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu. Posted on
Dec 23, 2025 - 18:36 PST
Completed -
The scheduled maintenance has been completed.
Jan 16, 16:00 PST
Scheduled -
Environmental Health & Safety Bldg. 565 - Interruption of Ventilation, Heating, Cooling and Exhaust Date: January 15 to January 16th, 2026 Time: 7AM to 4PM intermittently
FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems. ------------------------------------------------------------------------------------------------------------- All fume hoods will be out service - Thursday January 15, 2026 7:30 am – 4 pm --------------------------------------------------------------------------------------------------- Emergency Generator – Will be tested Friday January 16th, 2026 7:30am – 8:30am All electrical equipment connected to emergency power will be affected. --------------------------------------------------------------------------------------------------- Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.
Dec 23, 18:08 PST
Completed -
The scheduled maintenance has been completed.
Jan 14, 16:00 PST
Scheduled -
Isla Vista theater Bldg. 948 - Interruption of Ventilation, Heating, Cooling and Exhaust
Date: January 14, 2026 Time: 7AM to 4PM intermittently
FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems. -------------------------------------------------------------------------------------------- January 14, 2026 HVAC Supply Fans 1, 2 & 3 will be off before normally scheduled hours
Emergency Generator will be tested 7:30AM – 8:30AM -------------------------------------------------------------------------------------------- Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.
Dec 23, 18:02 PST
Completed -
The scheduled maintenance has been completed.
Jan 13, 16:00 PST
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jan 12, 07:00 PST
Scheduled -
Embarcadero Hall Bldg. 941 - Interruption of Ventilation, Heating, Cooling and Exhaust
Date: January 12 to January 13, 2026 Time: 7AM to 4PM intermittently
FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems. -------------------------------------------------------------------------------------------- Monday, January 12, 2026 AC-1 will be off before normally scheduled hours (serves Lecture Hall 1100) -------------------------------------------------------------------------------------------- Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.
Dec 23, 17:57 PST
Completed -
The scheduled maintenance has been completed.
Jan 9, 16:00 PST
Scheduled -
Harder Stadium 578 - - Interruption of Ventilation, Heating, Cooling and Exhaust
Date: January 8 to January 9, 2026 Time: 7am to 4pm intermittently
FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems. -------------------------------------------------------------------------------------------- Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.
Dec 23, 17:52 PST