UCSB Administrative Services Status Page
Investigating - Service Outage Notification
May 08, 2026 - 02:05 PDT
Update - Notice: Contractor Vehicle Near Cheadle Hall on 4/28

The contractor will have a truck parked adjacent to the new generator location (in the planter at the northeastern corner of Cheadle Hall) tomorrow, April 28, for approximately 2–4 hours.

The vehicle will be clearly marked and surrounded by delineators and caution tape to ensure visibility and maintain safety for all pedestrians and nearby traffic.

Please use caution when passing through the area.

Apr 27, 2026 - 08:42 PDT
Update - We have our demo contractor scheduled to perform their work next Thursday and Friday, April 23 & 24. The team plans on starting at 6 AM and will be done at 2:30PM. This will most likely be louder than normal demo due to the echo chamber effect in the basement. We will do our best to get the loud work done as early as possible each day.
Apr 14, 2026 - 16:22 PDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Apr 03, 2026 - 15:30 PDT
Scheduled - Design & Construction Services has three projects at Cheadle Hall with Plant Construction. See construction details below:

Work in the projects will include:

- Replacing the existing generator in the basement with a new generator in the planter area north east of Cheadle Hall.

- Removing the existing chiller and cooling tower and connecting the building to the campus chilled water loop. This will involve work in the basement, rooftop penthouse, and the installation of new underground piping across the plaza.

- Rebuilding of air handler equipment in the basement and rooftop penthouse.

Duration is anticipated to be now through late Fall. This listing will be updated throughout the project for upcoming construction activities and notifications.

Apr 3, 2026 15:30 - Sep 2, 2026 17:30 PDT
Identified - Chemistry (Bldg 557) Elevator 2 (Freight) is temporarily out of service while maintenance work is performed.

If you have any questions or concerns, please contact Ray Gonzales, FM Superintendent for Life Safety Services, at 805-451-8993.

Apr 22, 2026 - 09:03 PDT
Identified - The heating system in Education (Bldg 275) is currently turned off while Facilities Management (FM) works to repair the system.

If you have any questions or concerns, please contact Mike Smiyun, FM HVAC Sr. Superintendent, at (805) 451-8990

Mar 16, 2026 - 08:45 PDT
Identified - Biological Sciences II (Bldg 571) Elevator 2 is temporarily out of service while maintenance work is performed.

If you have any questions or concerns, please contact Ray Gonzales, FM Superintendent for Life Safety Services, at 805-451-8993.

Mar 13, 2026 - 15:04 PDT
Update - We are continuing to investigate this issue.
Jan 05, 2026 - 08:37 PST
Investigating - The steam boilers located in the basement that primarily serve the fourth floor auto claves in Bio II (571) have turned off for a unscheduled repair. We are actively working on securing the needed parts for the repair and strive to limit downtime to as little as possible.

If you have any questions or concerns, please contact Mark Irwin Superintendent Plumbing Services, at 805-722-8397

Thank you for your patience during this maintenance period.

Aug 22, 2025 - 15:24 PDT
Investigating - Service Outage Notification
Dec 13, 2025 - 08:22 PST

About This Site

Welcome to the UCSB Administrative Services Status page. This site provides timely information on resources managed by the Administrative Services Division of UCSB, including maintenance events, construction disturbances, and other service interruptions of business/IT systems and facilities. Please subscribe to email or text notifications advising when a major incident takes place or when infrastructure interruptions occur at specific UCSB facilities.

DEPARTMENTAL SYSTEMS HEALTH DASHBOARDS
----------------------------------------------------------------------------
UCSB Campus Services: http://status.ucsb.edu/
Instructional Development: http://status.id.ucsb.edu/
Student Affairs: https://status.sa.ucsb.edu/
Library: https://status.library.ucsb.edu/

CAMPUS BUILDINGS Under Maintenance
90 days ago
100.0 % uptime
Today
Arts - UCSB Building 534 Operational
Bio Sci Instruction Facility - UCSB Building 504 Operational
BioEngineering - UCSB Building 512 Operational
Biological Sciences II - UCSB Building 571 Operational
Biology Research Lab - UCSB Bldg 569 Operational
Bren Hall - UCSB Building 521 Operational
Broida Hall - UCSB Building 572 Operational
Buchanan Hall - UCSB Building 573 Operational
Building 434 - UCSB Building 434 Operational
90 days ago
100.0 % uptime
Today
Campbell Hall - UCSB Building 538 Operational
Cheadle Hall - UCSB Building 552 Under Maintenance
Chemistry - UCSB Building 557 Operational
Chemistry Annex - UCSB Building 570 Operational
CLAS - UCSB Building 300 Operational
Cloud Research Lab - UCSB Building 575 Operational
Creative Studies - UCSB Building 494 Operational
Education - UCSB Building 275 Operational
El Centro - UCSB Building 406 Operational
Elings Hall - UCSB Building 266 Operational
Ellison Hall - UCSB Building 563 Operational
Library - UCSB Building 525 Operational
Embarcadero Hall - UCSB Building 941 Operational
Engineering II - UCSB Building 503 Operational
Engineering Science - UCSB Building 225 Operational
Environmental Health & Safety - UCSB Building 565 Operational
Events Center - UCSB Building 505 Operational
Girvetz Hall - UCSB Building 564 Operational
Harder Stadium - UCSB Building 578/580 Operational
Harold Frank Hall - UCSB Building 556 Operational
Henley Hall - UCSB Building 226 Operational
Humanities & Social Sciences - USCB Building 515 Operational
Interactive Learning Pavilion - UCSB Building 506 Operational
Intercollegiate Athletics - UCSB Building 243 Operational
Isla Vista Theater - UCSB Building 948 Operational
Kerr Hall - UCSB Building 591 Operational
Kohn Hall - UCSB Building 567 Operational
Life Science - UCSB Building 235 Operational
Marine Biotechnology Lab - UCSB Building 555 Operational
Marine Science - UCSB Building 520 Operational
Materials Research Lab - UCSB Building 615 Operational
Mosher Alumni House - UCSB Building 517 Operational
Multi-Activity Center - UCSB Building 511 Operational
Music - UCSB Building 531 Operational
Noble Hall - UCSB Building 544 Operational
North Hall - UCSB Building 535 Operational
Old Gym and Pool - UCSB Building 479 Operational
Orfalea Family Children's Center - UCSB Building 355 Operational
Ocean Science Education Building - UCSB Building 514 Operational
Phelps Hall - UCSB Building 560 Operational
Physical Sciences North - UCSB Building 657 Operational
Physical Sciences South - UCSB Building 672 Operational
Pollock Theater - 277 Operational
Psychology - UCSB Building 551 Operational
Psychology East - UCSB Building 251 Operational
Public Safety - UCSB Building 574 Operational
Recreation Center - UCSB Building 516 Operational
Robertson Gym - UCSB Building 533 Operational
Social Sciences & Media Studies - UCSB Building 276 Operational
South Hall - UCSB Building 528 Operational
Storke Publications - UCSB Building 589 Operational
Student Affairs & Administrative Services - UCSB Building 568 Operational
Student Health - UCSB Building 588 Operational
Student Resource Building - UCSB Building 221 Operational
Student Services - UCSB Building 599 Operational
Theater & Dance East - UCSB Building 554 Operational
Theater & Dance West - UCSB Building 223 Operational
Webb Hall - UCSB Building 526 Operational
West Campus Building 7955 Operational
Woodhouse Lab - UCSB Building 546 Operational
CAMPUS INFRASTRUCTURE Operational
Electrical Distribution Operational
Natural Gas Distribution Operational
Potable Water Distribution Operational
Sanitary Sewer Conveyance Operational
Chilled Water Loop Operational
Seawater Distribution System Operational
CBORD Operational
90 days ago
99.93 % uptime
Today
Housing.ucsb.edu website Operational
90 days ago
100.0 % uptime
Today
Kx Registration Major Outage
90 days ago
99.99 % uptime
Today
Lenel OnGuard (Housing) Operational
90 days ago
100.0 % uptime
Today
Mercury (RMS) Operational
90 days ago
99.84 % uptime
Today
PMWeb Operational
90 days ago
100.0 % uptime
Today
T2 Operational
90 days ago
100.0 % uptime
Today
iService Desk - WebTMA Operational
90 days ago
99.97 % uptime
Today
Metasys Operational
90 days ago
100.0 % uptime
Today
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.

Scheduled Maintenance

Kerr Hall Bldg. 591 - Interruption of Ventilation, Heating, Cooling and Exhaust May 6, 2026 05:00 - May 8, 2026 14:00 PDT

Scheduled - Kerr Hall Bldg. 591 - Interruption of Ventilation, Heating, Cooling and Exhaust


Date: May 6 to May 8, 2026
Time: 5am to 2pm intermittently

FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.
--------------------------------------------------------------------------------------------
Wednesday, May 6, 2026

Emergency Generator will be tested from 7:00-8:00AM
--------------------------------------------------------------------------------------------
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Apr 28, 2026 - 09:45 PDT

North Hall Bldg 535 - Interruption of Ventilation, Heating, Cooling and Exhaust May 11, 2026 05:00 - May 13, 2026 14:00 PDT

North Hall Bldg. 535 - Interruption of Ventilation, Heating, Cooling and Exhaust


Date: May, 11 to May 13, 2026
Time: 7AM to 4PM intermittently

FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.
--------------------------------------------------------------------------------------------
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Posted on Apr 28, 2026 - 09:48 PDT

Library Bldg. 525 - Interruption of Ventilation, Heating, Cooling and Exhaust May 14, 2026 07:00 - Jun 3, 2026 16:00 PDT

Library Bldg. 525 - Interruption of Ventilation, Heating, Cooling and Exhaust

Date: May 14 to June 3, 2026
Time: 7AM to 4PM intermittently

FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.
--------------------------------------------------------------------------------------------
Wednesday June 3, 2026
Emergency Generator will be tested from 7:30AM to 8:30AM
--------------------------------------------------------------------------------------------
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Posted on Apr 28, 2026 - 09:53 PDT
May 8, 2026

Unresolved incident: Conferences Meet - meet.housing.ucsb.edu is down.

May 7, 2026

No incidents reported.

May 6, 2026

No incidents reported.

May 5, 2026
Completed - The scheduled maintenance has been completed.
May 5, 14:00 PDT
Scheduled - GGSE Bldg. 275 - Interruption of Ventilation, Heating, Cooling and Exhaust

Date: May 1 to May 5, 2026
Time: 5am to 2pm intermittently

FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.

Air Handler Maintenance will occur 5am to 9am on each day
--------------------------------------------------------------------------------------------
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Apr 28, 09:42 PDT
Resolved - This incident has been resolved.
May 5, 13:41 PDT
Investigating - Service Outage Notification
May 5, 13:37 PDT
May 4, 2026

No incidents reported.

May 3, 2026

No incidents reported.

May 2, 2026

No incidents reported.

May 1, 2026

No incidents reported.

Apr 30, 2026
Resolved - This incident has been resolved.
Apr 30, 19:12 PDT
Investigating - Service Outage Notification
Apr 30, 19:10 PDT
Completed - The scheduled maintenance has been completed.
Apr 30, 14:00 PDT
Scheduled - Social Sciences & Media Studies Bldg. 276 - Interruption of Ventilation, Heating, Cooling and Exhaust


Date: April 27 to April 30, 2026
Time: 5am to 2pm intermittently

FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.
--------------------------------------------------------------------------------------------
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Mar 14, 14:52 PDT
Apr 29, 2026
Completed - The scheduled maintenance has been completed.
Apr 29, 16:00 PDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Apr 29, 08:00 PDT
Update - We will be undergoing scheduled maintenance during this time.
Apr 27, 10:04 PDT
Scheduled - Exhaust System FE-3, FE-4, and FE-5 for BioEngineering (Bldg 512) will be temporarily shut down on Wednesday, April 29 from 8AM to 4PM while Facilities Management (FM) performs maintenance on the system.

If you have any questions or concerns, please contact Mike Smiyun, FM Sr. Superintendent for HVAC, at 805-451-8990.

Apr 27, 10:00 PDT
Completed - The scheduled maintenance has been completed.
Apr 29, 08:30 PDT
Scheduled - Date: April 29, 2026
Time: 7:30AM to 8:30AM

FM Preventative Maintenance staff will be performing testing of the Emergency Generator located at Building 276, and Emergency Circuits at buildings 275, 276, 277 will be affected.
The emergency generator will be tested April 29, 2026 from 7:30am to 8:30am

All equipment connected to emergency power will be briefly affected during transition of power from Normal source to Emergency Source. This affects buildings 275, 276, & 277

--------------------------------------------------------------------------------------------
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Mar 14, 15:20 PDT
Apr 28, 2026
Resolved - This incident has been resolved.
Apr 28, 00:27 PDT
Investigating - Service Outage Notification
Apr 28, 00:25 PDT
Apr 27, 2026

Unresolved incident: Cheadle Hall Construction Projects - Replace Cooling Generating Systems, Replace Generator, Replace Terminal and Package Units.

Apr 26, 2026

No incidents reported.

Apr 25, 2026
Resolved - This incident has been resolved.
Apr 25, 19:23 PDT
Investigating - Service Outage Notification
Apr 25, 17:03 PDT
Resolved - This incident has been resolved.
Apr 25, 19:23 PDT
Investigating - Service Outage Notification
Apr 25, 17:03 PDT
Apr 24, 2026
Completed - The scheduled maintenance has been completed.
Apr 24, 14:00 PDT
Scheduled - Pollock Theater Bldg. 277 - Interruption of Ventilation, Heating, Cooling and Exhaust


Date: April 23 to April 24, 2026
Time: 5am to 2pm intermittently

FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.
--------------------------------------------------------------------------------------------
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Mar 14, 14:47 PDT