Monitoring - Facilities Management is issuing this notice to inform the campus community in buildings served by the central chilled water system about how cooling responds during periods of extreme heat and peak demand.

The campus chilled water loop has a finite cooling capacity. When demand on the loop exceeds that capacity - typically during hot weather or periods of heavy campus-wide use - Facilities Management curtails comfort cooling to buildings in order to keep critical systems supporting research operational.

When this happens, affected buildings may experience warmer indoor temperatures than usual. This is expected and temporary. Comfort cooling is restored to normal levels as soon as demand on the loop drops back within capacity. The affected buildings for this curtailment event are as follows:

221 – Student Resource Building (SRB)
223 – Theater & Dance
243 – Intercollegiate Athletics Building
275 – Education Building
276 – Social Sciences and Media Studies
277 – Pollock Theater
505 – Events Center
515 – Humanities and Social Sciences Building
517 – Alumni House (Mosher Alumni House)
521 – Environmental Sciences Building (Bren Hall)
525 – Library
531 – Music Classroom Building
535 – North Hall
544 – Noble Hall
551 – Psychology Building
554 – Snidecor Hall
556 – Engineering I (Harold Frank Hall)

If you have questions about a specific building or system, contact Facilities Management: pf-customerservice@ucsb.edu

Aug 27, 2026 - 08:56 PDT
Identified - In anticipation of future development of the East Campus Student Housing Project, please note that a single lane for a portion of UCEN Rd will be closed to the public from 6 AM to 8 AM on Tuesday, June 16th, 2026. The map linked below will be updated to reflect this shortly.
https://www.map.ucsb.edu/?id=1982#!ce/60251?ct/90724,98591,93878,93879,96994,97031,60251?m/1212780?s/

Construction activities will center around underground utility work beneath the closed portion of the roadway for the East Campus project. Flaggers and signage will be provided during the closure to assist the public navigating this route.

Should you have any questions or concerns regarding these traffic impacts and construction work, please contact DCS Project Manager, Ana Heris at anaheris@ucsb.edu.

Jun 12, 2026 - 15:19 PDT
Identified - The heating system in Education (Bldg 275) is currently turned off while Facilities Management (FM) works to repair the system.

If you have any questions or concerns, please contact Mike Smiyun, FM HVAC Sr. Superintendent, at (805) 451-8990

Mar 16, 2026 - 08:45 PDT
Update - Upcoming Electrical Shutdown - 8/15 6:00am - 5:00pm

On Saturday, August 15, from 6:00 a.m. to 5:00 p.m., there will be a scheduled electrical shutdown to support the construction projects at Cheadle Hall.

We apologize for any inconvenience this may cause and will make every effort to restore power and re-energize the electrical panels before 5:00 p.m.

Thank you for your patience and understanding.

Aug 06, 2026 - 16:44 PDT
Update - Upcoming Activities:

See below the scheduled construction activities in the Cheadle Hall basement next week.

Week of 7/20

Monday - Welding/Installing pipe in basement

Tuesday - Welding/Installing pipe in basement

Wednesday - Welding/Installing pipe in basement

Thursday - Welding/Installing pipe in basement
Fan restoration in basement

Friday - Fan restoration in basement


Work will include minor demolition, partial HVAC shutdowns, and cleaning. Impacts include possible interruptions to the ventilation systems and odors. All products to be used meet the UCSB required specifications as non-toxic.

Jul 17, 2026 - 14:21 PDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jul 14, 2026 - 08:12 PDT
Scheduled - The Cheadle HVAC upgrade project is informing Cheadle Hall building occupants that the air conditioning system is currently under reconstruction, and not in operation at this time. Every effort is being made to expedite the work, which when complete will provide improved performance and efficiency; however, for the next several months the system will be down. With an approaching heat event, people are cautioned to take measures to ensure their safety and comfort, including appropriate dress, use of fans, and intake of water. We apologize for the inconvenience!
Jul 14, 2026 08:12 - Dec 11, 2026 07:12 PST
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Jun 15, 2026 - 07:00 PDT
Scheduled - We will be undergoing construction in the basement of the library, Ocean Side. Below is our current schedule of activities:

Two-day shutdown of the cooling system in Building A, beginning Monday 6/15
30-day shutdown of the cooling system in the rest of the library, beginning Monday 6/15
Chiller delivery and crane activity, Monday 6/22 through Tuesday 6/23
Ongoing concrete work, beginning Monday 6/29

Impacts include crane activity, noise, and disruption to the building's cooling system.

Jun 15, 2026 07:00 - Oct 31, 2026 15:00 PDT
Investigating - Service Outage Notification
Dec 13, 2025 - 08:22 PST

About This Site

Welcome to the UCSB Administrative Services Status page. This site provides timely information on resources managed by the Administrative Services Division of UCSB, including maintenance events, construction disturbances, and other service interruptions of business/IT systems and facilities. Please subscribe to email or text notifications advising when a major incident takes place or when infrastructure interruptions occur at specific UCSB facilities.

DEPARTMENTAL SYSTEMS HEALTH DASHBOARDS
----------------------------------------------------------------------------
UCSB Campus Services: http://status.ucsb.edu/
Instructional Development: http://status.id.ucsb.edu/
Student Affairs: https://status.sa.ucsb.edu/
Library: https://status.library.ucsb.edu/

CAMPUS BUILDINGS Degraded Performance
90 days ago
100.0 % uptime
Today
Arts - UCSB Building 534 Operational
Bio Sci Instruction Facility - UCSB Building 504 Operational
BioEngineering - UCSB Building 512 Operational
Biological Sciences II - UCSB Building 571 Operational
Biology Research Lab - UCSB Bldg 569 Operational
Bren Hall - UCSB Building 521 Operational
Broida Hall - UCSB Building 572 Operational
Buchanan Hall - UCSB Building 573 Operational
Building 434 - UCSB Building 434 Operational
90 days ago
100.0 % uptime
Today
Campbell Hall - UCSB Building 538 Operational
Cheadle Hall - UCSB Building 552 Under Maintenance
Chemistry - UCSB Building 557 Operational
Chemistry Annex - UCSB Building 570 Operational
CLAS - UCSB Building 300 Operational
Cloud Research Lab - UCSB Building 575 Operational
Creative Studies - UCSB Building 494 Operational
Education - UCSB Building 275 Degraded Performance
El Centro - UCSB Building 406 Operational
Elings Hall - UCSB Building 266 Operational
Ellison Hall - UCSB Building 563 Operational
Library - UCSB Building 525 Degraded Performance
Embarcadero Hall - UCSB Building 941 Operational
Engineering II - UCSB Building 503 Operational
Engineering Science - UCSB Building 225 Operational
Environmental Health & Safety - UCSB Building 565 Degraded Performance
Events Center - UCSB Building 505 Degraded Performance
Girvetz Hall - UCSB Building 564 Operational
Harder Stadium - UCSB Building 578/580 Operational
Harold Frank Hall - UCSB Building 556 Degraded Performance
Henley Hall - UCSB Building 226 Operational
Humanities & Social Sciences - USCB Building 515 Degraded Performance
Interactive Learning Pavilion - UCSB Building 506 Operational
Intercollegiate Athletics - UCSB Building 243 Degraded Performance
Isla Vista Theater - UCSB Building 948 Operational
Kerr Hall - UCSB Building 591 Operational
Kohn Hall - UCSB Building 567 Operational
Life Science - UCSB Building 235 Operational
Marine Biotechnology Lab - UCSB Building 555 Operational
Marine Science - UCSB Building 520 Operational
Materials Research Lab - UCSB Building 615 Operational
Mosher Alumni House - UCSB Building 517 Degraded Performance
Multi-Activity Center - UCSB Building 511 Operational
Music - UCSB Building 531 Degraded Performance
Noble Hall - UCSB Building 544 Degraded Performance
North Hall - UCSB Building 535 Degraded Performance
Old Gym and Pool - UCSB Building 479 Operational
Orfalea Family Children's Center - UCSB Building 355 Operational
Ocean Science Education Building - UCSB Building 514 Operational
Phelps Hall - UCSB Building 560 Operational
Physical Sciences North - UCSB Building 657 Operational
Physical Sciences South - UCSB Building 672 Operational
Pollock Theater - 277 Degraded Performance
Psychology - UCSB Building 551 Degraded Performance
Psychology East - UCSB Building 251 Operational
Public Safety - UCSB Building 574 Operational
Recreation Center - UCSB Building 516 Operational
Robertson Gym - UCSB Building 533 Operational
Social Sciences & Media Studies - UCSB Building 276 Degraded Performance
South Hall - UCSB Building 528 Operational
Storke Publications - UCSB Building 589 Operational
Student Affairs & Administrative Services - UCSB Building 568 Operational
Student Health - UCSB Building 588 Operational
Student Resource Building - UCSB Building 221 Degraded Performance
Student Services - UCSB Building 599 Operational
Theater & Dance East - UCSB Building 554 Degraded Performance
Theater & Dance West - UCSB Building 223 Degraded Performance
Webb Hall - UCSB Building 526 Operational
West Campus Building 7955 Operational
Woodhouse Lab - UCSB Building 546 Operational
CAMPUS INFRASTRUCTURE Degraded Performance
Electrical Distribution Operational
Natural Gas Distribution Operational
Potable Water Distribution Operational
Sanitary Sewer Conveyance Operational
Chilled Water Loop Degraded Performance
Seawater Distribution System Operational
CBORD Operational
90 days ago
99.99 % uptime
Today
Housing.ucsb.edu website Operational
90 days ago
100.0 % uptime
Today
Kx Registration Operational
90 days ago
99.97 % uptime
Today
Lenel OnGuard (Housing) Operational
90 days ago
100.0 % uptime
Today
Mercury (RMS) Operational
90 days ago
99.99 % uptime
Today
PMWeb Operational
90 days ago
100.0 % uptime
Today
T2 Operational
90 days ago
100.0 % uptime
Today
iService Desk - WebTMA Operational
90 days ago
99.99 % uptime
Today
Metasys Operational
90 days ago
100.0 % uptime
Today
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.

Scheduled Maintenance

Bldg. 266 - Elings Hall / CNSI - Annual Preventative Maintenance Notice - Interruption of ventilation, cooling, heating and exhaust Aug 24, 2026 05:00 - Sep 1, 2026 14:00 PDT

Scheduled - Location: 266 CNSI
Date: August 24 to Sept 1, 2026
Time: 5am to 2pm intermittently

FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.

Monday August 24, 2026
Supply Fan AH-1 will be off, before normally scheduled hours
Supply Fan AH-2 will be off, before normally scheduled hours
Exhaust Fans EF-1 & EF-4 will be off from 8 am to 12 noon
(These fans supply air, general exhaust, and fume hood exhaust for the first and second floors of the lab section (south wing of building), and perimeter areas of the third floor of the lab section.)
_____________________________________________________________________________________
Tuesday August 25, 2026
Supply Fan AH-3 will be off, before normally scheduled hours
(This fan serves levels 1,2,3 of the north east section of the building: Rooms 2001, 2003, 2005, 2024, 2601, 2603, 2611, 2615, 2619, 2621, 2809, 2810, 3001, 3005, multipurpose rooms 1601, 1605, and the sphere room.)
_____________________________________________________________________________________
Wednesday August 26, 2026
Clean Room Air Handler Units – PAH, CAH-1 & CAH-2 will be off from 7:00AM to 3:00PM

Exhaust Fans EF-2; EF-3 will be off from 7:00AM to 3:00PM

(These fans provide supply air, general exhaust, and fume hood exhaust for CLEAN ROOM, other labs on the third floor and lab maintenance rooms.)

Emergency Generator will be tested from 7:30am to 8:30am

(Generator tests will affect emergency circuits, throughout Elings Hall, parking structure, and Courtyard Café. Emergency circuits will lose power briefly during the test - less one minute while switching to the generator.)
_____________________________________________________________________________________
Thursday August 27, 2026
Exhaust Fan EF-5 will be off, 7:00 am to 9:00 am and restored by manual operation.
Check room before start 2404

(This exhaust fan serves all labs on all floors, primarily for chemical storage cabinets, vacuum pump exhaust, and other minor equipment. It also serves the wet benches in the clean room.)
_____________________________________________________________________________________
Friday August 28, 2026

House Vacuum may be disrupted for service from 10am to 12 Noon

(House Vacuum System serves vacuum on all lab floors)

Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Aug 19, 2026 - 20:28 PDT

Kohn Hall Bldg. 567 - Interruption of Ventilation, Heating, Cooling and Exhaust Sep 2, 2026 05:00 - Sep 5, 2026 14:00 PDT

Kohn Hall Bldg. 567 - Interruption of Ventilation, Heating, Cooling and Exhaust

Date: September 2 to September 4, 2026
Time: 5am to 2pm intermittently


Facilities Management Preventative Maintenance staff will be performing scheduled maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work will include inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and heating and cooling systems. Please note the following schedule.
---------------------------------------------------------------------------------------------
Wednesday September 2, 2026

HVAC Supply Fan 1 will be off before normally scheduled hours
---------------------------------------------------------------------------------------------
Thursday September 3, 2026

Building Heating System will be off Thursday July 18, 2024 from 7:00 AM to 12:00 PM

---------------------------------------------------------------------------------------------
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Posted on Aug 19, 2026 - 20:33 PDT

Harold Frank Hall Bldg. 556 - Interruption of Ventilation, Heating, Cooling and Exhaust Sep 8, 2026 05:00 - Sep 14, 2026 14:00 PDT

Harold Frank Hall Bldg. 556 - Interruption of Ventilation, Heating, Cooling and Exhaust

September 8 to September 14, 2026

Facilities Management Preventative Maintenance staff will be performing scheduled maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work will include inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and heating and cooling systems. Please note the following schedule.

Tuesday September 8, 2026

Supply fan S-1 will be off 5am-Noon
(Serves south side--first floor, second floor, and part of the third floor.)
---------------------------------------------------------------------------------------------
Wednesday September 9, 2026

EMERGENCY GENERATOR WILL BE TESTED FROM 7:30AM to 8:30AM.

Supply fan S-2 will be off. 5am-Noon
(Serves north side--first floor, second floor, and part of the third floor.)
---------------------------------------------------------------------------------------------
Thursday September 10, 2026

Supply fan S-3 will be off from 5AM to 12 Noon.
(Serves south side--fourth floor, fifth floor, and part of the third floor.)

---------------------------------------------------------------------------------------------
Friday September 11, 2026

Supply fan S-4 will be off 5am to Noon
(Serves northside--fourth floor, fifth floor, and part of the third floor.)

---------------------------------------------------------------------------------------------

Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu

Posted on Aug 19, 2026 - 20:39 PDT

Materials Research Laboratory Bldg. 615 - Interruption of Ventilation, Heating, Cooling and Exhaust Sep 15, 2026 05:00 - Sep 21, 2026 14:00 PDT

Materials Research Laboratory Bldg. 615 - Interruption of Ventilation, Heating, Cooling and Exhaust


Date: September 15 to September 21, 2026
Time: 5am to 2pm intermittently

Facilities Management Preventative Maintenance staff will be performing scheduled maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work will include inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and heating and cooling systems. Please note the following schedule.
---------------------------------------------------------------------------------------------
Tuesday September 15, 2026
HVAC Supply Fan S-1 will be off before normally scheduled hours
(This fan supplies air for all labs.)

Fume hood exhaust fans FE-1, FE-2, FE-3, and FE-4 will be off from 8AM to 12 noon.
(These fans provide fume hood and general exhaust in all labs.)

---------------------------------------------------------------------------------------------
Wednesday September 16, 2026

Emergency Generator will be tested, 7:30am to 8:30am
(Only Emergency Circuits will be affected by transfer of power)


---------------------------------------------------------------------------------------------
Thursday September 17, 2026

Building Heating system will be off from 8AM to 4PM.

---------------------------------------------------------------------------------------------
Friday September 18, 2026

Building cooling system will be off from 8AM to 2PM.
Compressed Air may be disrupted from 8AM to 9am
---------------------------------------------------------------------------------------------

Monday September 21, 2026

Lab equipment cooling water will be off from 8AM to 2PM.
---------------------------------------------------------------------------------------------

Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Posted on Aug 19, 2026 - 20:46 PDT
Aug 27, 2026

Unresolved incidents: Chilled Water Loop - Comfort Cooling Curtailment Enacted, Life Sciences, 235; Psychology, 551; Psychology East, 251 – East Campus Student Housing Project, Education (Bldg 275) - Heating Outage.

Aug 26, 2026

No incidents reported.

Aug 25, 2026
Completed - The scheduled maintenance has been completed.
Aug 25, 16:30 PDT
Scheduled - Please note that the chilled water will be turned off today due to construction activity.

We apologize for the inconvenience and appreciate your understanding.

Aug 21, 16:24 PDT
Aug 24, 2026

No incidents reported.

Aug 23, 2026

No incidents reported.

Aug 22, 2026

No incidents reported.

Aug 21, 2026
Completed - The scheduled maintenance has been completed.
Aug 21, 14:00 PDT
Scheduled - Engineering Science Bldg. 225 - Interruption of Ventilation, Heating, Cooling and Exhaust

Date: August 18 to August 21, 2026
Time: 5AM to 2PM intermittently

FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.

--------------------------------------------------------------------------------------------
PLEASE MAKE SURE ALL OCCUPANTS ARE NOTIFIED NOT TO USE FUME HOODS AND GAS CABINETS DURING OUTAGES AFFECTING THEIR AREAS.

--------------------------------------------------------------------------------------------
Tuesday August 18, 2026

Supply Fan AH-1 will be off before normally scheduled hours
(serves labs on second and third floor north)

--------------------------------------------------------------------------------------------
Wednesday August 19, 2026
Emergency Generator will be tested from 7:00AM to 8:00AM
(generator tests will affect emergency circuits throughout the building. Emergency circuits will lose power briefly during the test - less than one minute while switching to the generator)

Supply Fan AH-2 will be off before normally scheduled hours
(serves Labs on second and third floor south)

--------------------------------------------------------------------------------------------
Thursday August 20, 2026

Exhaust Fans EF-1 & EF-2 will be off from 8:00AM to 12:00PM
(serves Labs and fume hoods on the second and third floor)

Compressed Air for general lab air will be off line 8:00AM to 9:00AM
--------------------------------------------------------------------------------------------

Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Jun 23, 21:34 PDT
Aug 20, 2026

No incidents reported.

Aug 19, 2026

No incidents reported.

Aug 18, 2026
Completed - The scheduled maintenance has been completed.
Aug 18, 08:56 PDT
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
May 26, 07:00 PDT
Scheduled - The freight elevator (Car #3) in Biological Sciences II (Bldg 571) will be out of service beginning Tuesday, May 26th through the end of August while elevator modernization work is performed.

Please plan accordingly, as freight elevator access will be unavailable during this time.

If you have any questions or concerns, please contact Perrin Pellegrin, DCS Program Manager, at (805) 570-7429 or perrin@ucsb.edu

May 14, 13:05 PDT
Aug 17, 2026
Completed - The scheduled maintenance has been completed.
Aug 17, 14:00 PDT
Scheduled - Engineering 2 Bldg. 503 - Interruption of Ventilation, Heating, Cooling and Exhaust

Date: July 30 to August 17, 2026
Time: 7AM to 4PM intermittently

FM Preventative Maintenance staff will be performing scheduled preventative maintenance work on the building’s heating, ventilating and air conditioning (HVAC) systems. This work includes inspection and replacement of air filtration media and fan motor belts, lubrication of motors, and inspection/repair of associated ventilation and hydronic heating and cooling systems.

--------------------------------------------------------------------------------------------
PLEASE MAKE SURE ALL OCCUPANTS ARE NOTIFIED NOT TO USE FUME HOODS AND GAS CABINETS DURING OUTAGES AFFECTING THEIR AREAS.

--------------------------------------------------------------------------------------------
Thursday July 30, 2026

HVAC AH –1 System will be off 5:00AM to 11:00AM
(serves interior rooms on the first, second and third floors of the southwest annex. Perimeter rooms will not be affected)

--------------------------------------------------------------------------------------------
Monday August 3, 2026

HVAC Supply Fan 1 will be off 5:00AM to 11:00AM
(serves rooms 1119A, B, C, D, E. 2111, 2119, 2120, 2122, 2122A, B, 3111, 3119, 3119A, 3120, 3122)

Fume Hood Exhaust Fan FE-1 will be off 1:00PM to 4:00PM
(serves 1117, 1119A, 1119C, 1119D, 2111, 2119, 2120, 2122, 2122A, B, 3111, 3119, 3119A, 3120, 3122)

Fume Hood Exhaust Fan FE-9 will be off 1:00PM to 4:00PM
(serves one fume hood in room 3119)

--------------------------------------------------------------------------------------------
Tuesday August 4, 2026

HVAC Supply Fan 2 will be off 5:00AM to 11:00AM
(serves 1119B, 1119E, 1119G, 1119H, 1151A, 1151B, 2133, 2134, 2145, 3133, 3134, 3146)

Fume Hood Exhaust Fan FE-2 will be off from 12:00PM to 2:00PM
(serves rooms 2133, 2134, 2119, 2120, 3122, 3133, 3134. Also serves the south end of the MOCVD Lab)

--------------------------------------------------------------------------------------------
Wednesday August 5, 2026

HVAC Supply Fan 3 will be off 5:00AM to 11:00AM
(serves 1148, 1150, 1161, 1165, 2157, 2171, 2176, 2178, 3145, 3145A, 3157, 3163, 3165, 3176, 3178)

Fume Hood Exhaust Fan FE-3 will be off from 11:00AM to 2:00PM
(serves rooms 1161, 1165, 1177, 2145, 2146, 2157, 2171, 2211, 3145, 3146, 3157, 3163, 3165. FE-3 also serves the north end of the MOCVD equipment aisle)

--------------------------------------------------------------------------------------------
Thursday August 6, 2026

HVAC Supply Fan 4 will be off 5:00AM to 11:00AM
(serves 1177, 1207, 1207A, 1208, 2211, 2218, 3177, 3211, 3217, 3218)


Fume Hood Exhaust Fan FE-4 will be off from 11:00 AM to 4:00PM
(serves 1204, 1207, 1208, 1227B, 2211, 2118, 3177, 3211, 3217, 3218)

--------------------------------------------------------------------------------------------
Friday August 7, 2026

Vacuum may be disrupted 8:00AM to 12:00PM

HVAC Supply Fan 5 will be off 5:00AM to 11:00AM
(serves 2110, 1227, 1227A, 1227B, 1227E, 1239C, 2217, 2226, 2229, 3223, 3228, 3228A)

Fume Hood Exhaust Fan FE-5 will be off from 11AM to 2:00PM
(serves rooms 1227, 1227A, 2217, 2226, 2229, 2231, 2171, 3222, 3223, 3226, 3229, 3235)

Fume Hood Exhaust Fan FE-10 will be off from 11:00AM to 2:00PM
(serves single fume hood in room 3223)

--------------------------------------------------------------------------------------------
Monday August 10, 2026

HVAC Supply Fan 6 will be off 5:00AM to 11:00AM
(serves rooms 1231, 1231A, 1237, 1239, 2231, 2235, 3228, 3229, 3236)

Fume Hood Exhaust Fan FE-6 will be off from 11:00AM to 2:00PM
(serves rooms 1231, 1239, 2232, 2235, 2331, 3235, 3236, 3229 fume hood #1)

Fume Hood Exhaust Fan FE-8 will be off from 11:00AM to 2:00PM
(serves room 1239)

Fume Hood Exhaust Fan FE-11 will be off from 11:00AM to 2:00PM
(serves room 1239C)

--------------------------------------------------------------------------------------------
Tuesday August 11, 2026

Compressed air may be disrupted between 8:30AM to 12:00PM

HVAC Supply Fan 7 will be off 5:00AM to 11:00AM
(serves 1245, 1245A, 1245B, 1245C, 1245D, 2232, 2243, 3235, 3243)

Fume Hood Exhaust Fan FE7 will be off from 1:00PM to 4:00PM
(serves rooms 1231A, 1237, 1245A, 1239, 2232, 2243, 3243)

--------------------------------------------------------------------------------------------
Wednesday August 12, 2026

Emergency Generator will be tested 7:00AM to 8:00AM
(only emergency power circuits will be briefly interrupted in transition of power and may cause interruption of Equipment cooling systems)

HVAC AHU-1 will be off 5:00AM to 11:00AM
(this fan provides supply air for Palmstrom lab 1315)

Exhaust Fan EF-1 will be off from 11:00AM to 2:00PM
(this fan provides exhaust and fume hood exhaust for Palmstrom lab 1315)

--------------------------------------------------------------------------------------------
Thursday August 13, 2026

HVAC AHU-4A will be off 5:00AM to 8:00AM
(this fan provides half the supply air for the MOCVD Lab)

HVAC AHU-4B will be off 8:00AM to 11:00AM
(this fan provides half the supply air for the MOCVD Lab.)

Fume Exhaust Fan FE-1A will be off 11:00 AM to 2:00PM
(serving room 3229 fume hoods and snorkels)

--------------------------------------------------------------------------------------------
Friday August 14, 2026

HVAC AHU – 5A will be off 5:00AM to 8:00AM
(serves the Teaching Clean Room)

Exhaust Fan EF-1A will be off from 11:00AM to 2:00PM
(serves the Teaching Clean Room, the center section of the MOCVD Lab, and the south end of the MOCVD equipment aisle)

Exhaust Fan EF-2A will be off from 11:00AM to 2:00PM
(serves the Teaching Clean Room and the north end of the MOCVD Lab)

--------------------------------------------------------------------------------------------
Saturday August 15, 2026

Date reserved for service of equipment in 3426 serving lab (Recharge Work)
AHU-1
FC-2

--------------------------------------------------------------------------------------------
Please contact Michael Lindner, Facilities Management Preventative Maintenance Superintendent with any questions of concerns: michael.lindner@ucsb.edu.

Jun 23, 21:24 PDT
Aug 16, 2026

No incidents reported.

Aug 15, 2026

No incidents reported.

Aug 14, 2026

No incidents reported.

Aug 13, 2026

No incidents reported.